CREST ERP gives you the following four Standard Reports, in addition to the several lists readily available with multiple filters that you have already seen.
Let us look at the contents of these reports in brief.
Production Run Report
This report is exactly the same as the list you can generate from the Production Run tab. While the list has as limit of 50 rows per page, the same does not apply to this report and you can get all data in the same report, that downloads as an Excel file.
Cost Sheet
This report is generated for individual Production Runs, though a wildcard search will list ALL Runs. You can download the Cost Sheet for every Production Run by clicking the Generate PDF link against it.
Sample Report
Workorders Pending Issue
This is a very useful report, for which a separate list is not available. You can filter the report by Input or Output product, facility, Routing Task and Production Run ID. You can export this report to excel by clicking the link
Fixed Asset Usage Report
This is an organisation-level report that gives certain useful information regarding the actual usage of an asset in Production. This could give a hint about the remaining service life or the importance of the asset to the business
Report Sample
Post your comment on this topic.