Click the storm data “RainData” that was added to the Resource Library in the previous step. Click the Add to Model button. In the pop-up window, select the last option, give a rain group name “RainData” and click OK.
A successful message will show. Click OK to close the message box. Close the Resource Library window. Check the rain data is added to the Rain Data group in the Project Manager.