This section describes the behaviour of the system when there are more than a Job at anytime for a property.

This section describes the behaviour of the system when there are more than a Job at any time for a property.
For certain Job types (e.g. Re Inspection, Encapsulation and Removal) if there are two jobs created for the same property, as soon as one of the records is updates the same record is locked in the other job.
For example:
For Property with UPRN 1000 there are two Removal Jobs in progress. Let’s assume the property has the following information:

Job 1

Inspection No Floor Room Element Result
1 Ground Floor Room 01 Ceiling Asbestos
2 Ground Floor Room 01 Floor Asbestos
3 Ground Floor Room 01 Panel Asbestos

Job 2

Inspection No Floor Room Element Result
1 Ground Floor Room 01 Ceiling Asbestos
2 Ground Floor Room 01 Floor Asbestos
3 Ground Floor Room 01 Panel Asbestos

As soon as the user of Job 1 edits the Inspection 2, the same inspection is no longer editable in Job 2.

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Please do not use this for support questions.
For customer support, please contact us here.

Post Comment