EPC Systems Admins are able to define multiple Risk Matrix Types. Each Risk Matrix Type has their own customizable Risk Matrix and Risks can be created with the different Risk Matrix Types applied.

EPC System Admins can create, rename or delete Risk Matrix Types in the Attributes tab, which is explained at Risk Matrix Types