Indirect impact
Introduction:
Indirect impact is nothing more than a non-mathematical relationship between items.
Procedures:
1. To link one item to another, you need to configure the system. To do this, go to the Settings menu > Indicators > General tab > Select the Indirect impact option and save:
Note: if you wish, you need to do the same procedure for the other items (project, strategic objective, parameter). To do this, access the respective settings.
2. Edit the indicator and in Relationships/Indirect impact items, click on Search:
3. Select the items that will be linked to this indicator and click on Confirm:
4. Click Save. Done, link created:
5. To view the link in tree format, click More and then the Relationships option:
5.1 Check the Causes and Display indirect impact items options:
Conclusion:
This topic demonstrated how to create an indirect link between items.