(a) The course for the 2km Beach Run Relay will be as detailed in the diagram, where practical, in soft sand. The Referee may set an alternate course on beaches with more or restricted room.

(b) The start/changeover line shall be designated by a line in the sand or a brightly coloured synthetic cord stretched between two poles with green and yellow flags attached. The finish line shall be two green flags placed approximately five metres apart and on the shoreward side of the start/turn line. The Referee shall determine the length of the start/turn line.

(c) Running lanes: The course shall be divided into two lanes parallel to the waterline The lane closest to the water shall be for legs running from the start/finish lines (first leg for both team members). The lanes shall be divided by coloured tape, bunting, or other appropriate material.

Note: Should the course be run in the reverse direction the outwards legs shall be on the shoreward side and the return legs on the water side.

(d) Two poles with green and yellow flags attached approximately five metres apart and situated approximately 250mm from the start at the end of the lane divider shall designate the turning point.