Previously, macros such as the Schedule macro relied solely on the selected items in the gantt chart. However, as of ROB-EX Scheduler 7.2.4, certain macros have introduced a selection context feature. This enhancement allows macros to dynamically switch between utilizing the selection in either the gantt chart or the order list, depending on the launch location.

If a macro is launched from the order list and requires an operation selection, the first operation of the order will be passed to the macro.

Supported macros

Below is a list of macros that have implemented the selection context feature: