BASIC DOCUMENTATION
I19-1 Biophilic Design Exploration Documentation
READY AUDIT
- Agenda with times.
- Attendee list.
- Examples of the tools and instruments used in the Exploration, such as slideshows, handouts, activity sheets, etc.
I19-2 Biophilic Framework
READY AUDIT
- The final Biophilic Framework.
- Short narrative describing how the Framework evolved over the course of the project from the initial draft following the Biophilic Design Exploration to the final version.
- Any relevant cultural, ecological, and climatic studies.
I19-3 Biophilic Plan
READY AUDIT
- The Biophilic Plan, including communication and decision-making strategies as well as the means to, and schedule for, tracking the implementation of biophilic design strategies over the course of the project.
I19-4 Biophilic Results
READY AUDIT
- Narrative that explains how biophilic design was incorporated, reflects stakeholder priorities, and meets the requirements outlined in the requirements.
- Photographs of the completed project highlighting the biophilic elements and attributes in the project.
I19 Case Study
FINAL AUDIT
A summary narrative describing the project team’s approach to the imperative, highlighting any lessons learned or particularly rewarding outcomes.