May 2024
Corrections made as needed throughout for grammar, punctuation, nomenclature, typos, and links.
I05 Responsible Water Use (C3)
CLARIFICATIONS
- Potable Water Reduction Clarifications
- Creating the Baseline
- Re-organized for clarity of meaning and extensive detail added about developing customized baselines.
- Creating the Baseline
- Irrigation Clarifications
- Interior Landscapes
- Guidance added regarding potable water and watering interior plants.
- Interior Landscapes
- Stormwater Clarifications
- Re-organization throughout for clarity of meaning.
- Downstream Context
- New clarification added with definitions of downstream contexts referred to in Table 5-6.
- General Stormwater Requirements
- Historic and Pre-development Hydrology
- Subheading changed to reflect clarified definition of “historic hydrology” and intent that for purposes of the Imperative, “historic hydrology” and “pre-development hydrology” have the same meaning.
- Historic and Pre-development Hydrology
- Modeling
- Detail provided on the required modeling outputs.
- Municipal Stormwater Connection
- Clarification making explicit that the subject flows are those leaving the site in compliance with the thresholds specified in Table 5-6.
EXCEPTIONS
- AMENDED
- WT-001 Site-Constrained Stormwater Discharge
- Specificity added regarding analyses, documentation, and calculations required for use of the exception and clarification that flows off site must not exceed historic volumes.
- WT-001 Site-Constrained Stormwater Discharge
CALCULATIONS
- Example Customized Baseline By Standard End Use
- New example calculation
DOCUMENTATION REQUIREMENTS
- I05-1 Potable Water Use Documentation
- Ready Audit
- Additional documentation required regarding assumptions and calculations for all projects and additional detail on what must be provided when using a customized baseline.
- Ready Audit
- I05-2 Irrigation Documentation
- Ready Audit
- Added detail regarding what must be shown on landscape drawings.
- Ready Audit
- I05-3 Stormwater Documentation
- Ready Audit
- Added detail regarding documentation to show compliance with Peak Runoff Rate and Volume Management Control requirements.
- Final Audit
- If connecting to a municipal stormwater system:
- Required documentation reduced; metering requirement removed and calculations of pumping energy moved to I07.
- If connecting to a municipal stormwater system:
- Ready Audit
RESOURCES
- Resources added to support climate adaptation calculations
I06 Net Positive Water
CLARIFICATIONS
*Acceptable Supply
- Groundwater
- New subheading to highlight additional detail added regarding analyses needed to show that the rate of withdrawal does not exceed the groundwater recharge rate.
EXCEPTIONS
- AMENDED
- WT-008 Scale Jumping Within An Aquifer
- New requirement to request approval in advance for use of the exception added along with description of supporting documentation that must accompany the request.
- WT-008 Scale Jumping Within An Aquifer
DOCUMENTATION REQUIREMENTS
- I06 Water Narrative
- Ready Audit
- Detail regarding analyses required for projects using groundwater consistent with the language added to the Acceptable Supply clarification in this update.
- Detail added regarding what is needed to demonstrate resiliency requirements.
- Ready Audit
- I06-3 Metered Data Table
- Final Audit
- Projects Using a Well
- Additional calculation confirming that withdrawal has not exceeded the recharge rate cited in the Ready Audit documentation.
- Projects Using a Well
- Final Audit