May 2024

I12 Responsible Materials (C6)

CLARIFICATIONS

  • Living Product Challenge Clarifications
    • Clarification regarding the time period during which the Living Product Challenge label must be active.
  • Sourcing Distance Clarifications
    • Materials Construction Budget
      • Additional methods for defining materials costs

DOCUMENTATION REQUIREMENTS

  • I12-1 Materials Tracking Table
    • Ready Audit
      • New documentation regarding estimating and tracking project costs.
  • I12-2 Declare Documentation
    • Ready Audit
      • Specificity added regarding acceptable advocacy documentation
  • I12-4 FSC-Certified, Salvaged, and Intentionally Harvested Wood Documentation
    • Ready Audit
      • Note underscoring that the effect of any onsite tree harvest must be addressed in the adaptive management plan required under I01 Ecology of Place (C1)).

I13 Red List

CLARIFICATIONS

  • Declare Product Clarifications
    • Declare
      • Clarification regarding the time period during which the Declare label must be active.
  • Volatile Organic Compound Clarifications
    • Wet-applied Products
      • Clarifications added regarding the effective date of the reference standards and underscoring that wet-applied products must also comply with CDPH requirements.

EXCEPTIONS

  • RL-009a Formaldehyde
    • Revised testing standard for Super E0 and E0 classifications in Australia and New Zealand
  • RL-021 Red List CASRN Removal
    • 68585-23-9 Novolac Resin (Phenol formaldehyde polymer) added to the list of chemicals removed from the Red List.

DOCUMENTATION REQUIREMENTS

  • Exception Documentation
    • RL-002a Small Electrical Components
      • Requirement for advocacy removed
    • Various
      • Additional detail regarding acceptable due diligence documentation, advocacy content, and manufacturer letters.

I14 Responsible Sourcing

CLARIFICATIONS

  • Declare Product Clarifications
    • Declare
      • Clarification regarding the time period during which the Declare label must be active.
  • Living Product Challenge Clarifications

DOCUMENTATION REQUIREMENTS

  • I14-4 FSC-Certified, Salvaged, and Intentionally Harvested Wood Documentation** Ready Audit
    • Note underscoring that the effect of any onsite tree harvest must be addressed in the adaptive management plan required under I01 Ecology of Place (C1).

I15 Local Economy Sourcing

CLARIFICATIONS

DOCUMENTATION REQUIREMENTS

  • 15-1
    • Ready Audit
      • New documentation regarding estimating and tracking project costs.

I16 Net Positive Waste

CLARIFICATIONS

  • Dedicated Recycling and Compostables Collection
    • New heading and clarification detailing requirements for recycling and compostables.