SURPLUS RENEWABLE ENERGY CALCULATIONS
Note:
- PP kWh = Excess kWh during performance period.
- EPA Grid Factor = EPA factor (tCO₂e/kWh), taken from EPA eGRID Summary Table for project subregion (total output emission rate). Note: The values taken from the eGRID table need to be converted from lb/MWh to ton/kWh by dividing by 2×10⁶
- PP tCO₂e =
tCO₂e avoided due to excess generation during performance period.
Step 1 – Convert eGRID factor from lb/MWh to ton/kWh by dividing by a factor of 2×10⁶.
Step 2 – Multiply excess kWh fed back into the grid during the performance period by the EPA grid factor
for project subregion.
- (PP kWh) x (EPA grid factor) = (PP tCO₂e)
Step 3 – Multiply the tCO₂e avoided due to excess generation by 10 years.
- (PP tCO₂e) x 10 years = Total tCO₂e credit toward carbon offset
EXAMPLE CALCULATION
Assume a project in the Pacific Northwest producing 1000 kWh of surplus during its 12-month performance period.
Step 1 –
Convert eGRID factor from lb/MWh to ton/kWh by dividing by a factor of 2×10⁶.
- 635.5 lb CO₂e / (2×10⁶) = 0.0003177 tCO₂e/kWh
Step 2 – Multiply excess kWh fed back into the grid during the performance period by the EPA grid factor for project subregion.
- (1,000 kWh) x (0.0003177 tCO₂e/kWh) = 0.3177 tCO₂e
Step 3 – Multiply the tCO₂e avoided due to excess generation by 10 years.
- (0.3177 tCO₂e) x 10 years = 3.177 tCO₂e credit toward carbon offset