Brandon wrote: Aug 19, 2023

Follow the laminate schedule described in "2.4 Laminate Flat Panels". The doubler adds stiffness to the edge of the opening in the companionway-- doubling the thickness of the core in that location adds 4x the stiffness. The surface laminates should be the same as the rest of the panel.


Kurt Gauss wrote: Aug 19, 2023

Please provide details for the Comp Coming. I have laminated the Comp Bulk to the Comp Doubler with large chamfers.


Brandon wrote: Jul 26, 2023

You can add the Comp Doubler before laminating but make sure you create a nice ramp for the glass by either chamfering the doubler edge or sweeping a generous epoxy fillet around the doubler. Their are directions later on in the build for preassembling panels such as the bottom doublers.


Kurt Gauss wrote: Jul 25, 2023

Should the Comp Doubler to the Comp Bulkhead before laminating? Are there any other parts that should be preassembled apart from joining panels?