• English
    • EspaƱol
Conexiones GSR
1
  • 1
Table of Contents
Conexiones GSR
  • 1
    • Conexiones GSR — 1
GrabGrab
GrabGrab
  • Introduction
  • Physical Connections
    • Controller
      • Edel Advanced K2
      • Hitachi MCUB
      • KONE Monospace
      • Monarch Nice 3000+
      • MP
      • Mitsubishi Nexway
      • Orona Arca 2
      • OTIS
      • Rekoba EKM 66 / EKM 68
      • Schindler 3300
      • Step AS380
      • SJEC
      • Sodimas NG 240
      • Sodimas qi touch
      • Sodimas V1
      • Thyssen CMC3
      • Kollmorgen MPK 411
      • Safeline Thor
      • Toolkit TM4
    • Variable Speed Drives
      • Fuji Frenic LM2A
    • Boilers
      • Conventional boiler
      • Smart boiler
    • Webserver
      • Remote Programming Siemens PLC Logo!
    • Binary Acquisition card
      • Features
      • Connection
      • Platform configuration
    • Relay USB
  • Platform Connection
    • Download App
    • Platform configuration
    • Carlos Silva
  • Quick Start Guides
  • Rules for GSR in Smart Control
    • Generic rules
    • Rules for Otis
    • Rules for Kone
    • Rules for Schindler
    • Rules for Monarch
    • Rules for Rekoba
    • Rules for Xizi
    • Rules for Xiolift
    • Rules for Orona
    • Rules for Edel
    • Rules for Step
Download as PDF

Edel Advanced K2

Controller
Hitachi MCUB

!Compatible with versions previous to EN81-50 (EN81-50 not compatible).

*Before starting, follow the Installation and Start-up guide

1. Connections available for GSR

RS232 option USB option
EDE Advanced K2 Toolkit RS232 EDE Advanced K2 Toolkit USB

2. Connection to controller

1. Remove the console.

2. Locate connector JP1 and connect the cable to it.

3. According to the type of connection in GSR, use one of the ports below

Connection by RS-232 Connection by USB

4. Make the connection.

Connection by RS-232 Connection by USB

*Follow the next steps in Platform use

Controller
Hitachi MCUB
Copyright © 2025 Nayar Systems — Powered by Manula.com