By selecting the “Add / Edit” button in the “Schedule” box, the schedule trigger form is displayed.

1. Start time

In this field, the start time of the scheduler is set.

  • Run Time: The start time of the scheduler when deploying scheduling events is independent of the process (if the occurrence is independent of the process).
  • After Run Time: The event is triggered after the specified amount of time
  • Start Time: A specific start time can be specified for the event.

2. End time

In this field, the timing is set to end.

  • Null: By choosing this option, the expiration time of the scheduler will be undefined.
  • End time: By choosing this option, the end time of scheduler will be set to whatever is defined in this field

3. Simple Scheduling

If you need a simple scheduler, use the simple option to determine the number and spacing of repetitions.
  • Repeat Count: The number of times that the scheduler is run can be specified in this box. If you select “Forever,” the scheduler will be repeated forever.
  • Repeat interval: The time interval between scheduling repetitions