ActiveControl 7.00 introduces a new My Incomplete Manual Items metric in the Web UI.
This link opens to a list of the Manual Steps and Manual Activities that are awaiting your action.
i) Steps that are required and are holding up Imports are indicated with a red hand.
ii) Steps that are required but not holding up Imports are indicated with an orange hand.
These manual items can then be marked as completed via the Web UI when they have been performed.
From here you can select the transport form or complete the manual step / manual activity.
Post your comment on this topic.