BASIC DOCUMENTATION
All Projects
I20-1 Case Study Content
FINAL AUDIT
- A brief narrative for each targeted Imperative. Project teams pursuing two-part audit may complete case study narratives for the final audit Imperatives at the time of the final audit.
I20-2 Proof of Open Day
FINAL AUDIT
- The advertisement and agenda of the open day
- List or total number of attendees at the open day
For secure facilities, also include:
- A narrative of which spaces were open during the tour and which were not with rationale. For spaces not open, a description of how relevant LBC strategies were conveyed to visitors.
For projects with regular public tours provide:
- Narrative or copy of advertisement which describes the frequency, cost, and protocol to provide access to all regardless of ability to pay
- List or total number of attendees on regular tours throughout the 12-month performance period
I20-3 Operations and Maintenance Manual
READY AUDIT
- A copy of the Operations and Maintenance (O&M) Manual.
I20-4 Living Future Accreditation (LFA) Certificate
READY AUDIT
- International Living Future Institute-issued LFA certificate for a minimum of one project team member, confirming LFA is active when the project is submitted for audit.
I20-5 Video (Optional)
FINAL AUDIT
- An educational video describing the project’s Living Building Challenge features.
All Projects Except Single-Family Residential
I20-6 Website
READY AUDIT
- Educational website URL
I20-7 Brochure
READY AUDIT
- A copy or .pdf of the brochure.
I20-8 Signage
READY AUDIT
- Map showing proposed location of interpretive signage.
- Submit an approved and complete mock up of proposed signage.
FINAL AUDIT
- Signage must be in place during the virtual site visit.