Factory-Installed Forced Load Sharing
If the ATevo is ordered with the forced load sharing feature, the hardware and software configuration will be completed at the factory. The forced load sharing Serial Communications Adapters (A13) and software will be verified during production test. The signal interconnection cable will be supplied in a bagged kit, to be connected to the ATevos in the field after installation.
Installing Forced Load Sharing in the Field
If forced load sharing is added to the ATevo in the field, the following hardware and software configurations will be required.
- Install Serial Communications Adapter (A13) according to instructions in the supplementary ATevo Communications Manual (JA0102-54).
- Configure jumpers on the Serial Communications Adapter (A13) to operate in 2-WIRE RS-485 mode.
2-Wire RS-485 Settings | ||
---|---|---|
Jumper(s) | Label | Setting |
P2 | RXCTRL | TXE |
P3 | MEDIA | 485 |
P4, P5 | 485-TERM | OFF |
P6, P7 | #WIRES | 2W |
Last modified:
12 September 2022