In the Grid tab of the Form / Behavior / Control window, users can configure properties that govern the functionality of grid controls.

- Enable Edit: This is a checkbox which, if selected, allows users to enable edit mode for the control.
- If this checkbox is selected, it will enable the Edit Form field.
- Edit Form: This is a single-select dropdown field that retrieves the list of form behaviors (from the Form Behavior section of the Forms module). It allows users to select the form behavior linked to the control’s ‘edit’ functionality.
- To define a new form behavior, select the
button.
- It will display the Form Behavior Properties window.
- To modify an existing form behavior, select the
button.
- To remove a form behavior, select the
button.
- To define a new form behavior, select the
- Edit Form: This is a single-select dropdown field that retrieves the list of form behaviors (from the Form Behavior section of the Forms module). It allows users to select the form behavior linked to the control’s ‘edit’ functionality.
- If this checkbox is selected, it will enable the Edit Form field.
- Enable Import from Excel: This is a checkbox which, if selected, allows users to enable both the Excel Template and Import from Excel functions for the control.
- If this checkbox is selected, it will enable the Import Form field.
- Import Form: This is a single-select dropdown field that retrieves the list of starter form behaviors (from the Form Behavior section of the Forms module). It allows users to select the form behavior linked to the control’s ‘inline add’ functionality.
- To define a new form behavior, select the
button.
- It will display the Form Behavior Properties window.
- To modify an existing form behavior, select the
button.
- To remove a form behavior, select the
button.
- To define a new form behavior, select the
- Import Form: This is a single-select dropdown field that retrieves the list of starter form behaviors (from the Form Behavior section of the Forms module). It allows users to select the form behavior linked to the control’s ‘inline add’ functionality.
- If this checkbox is selected, it will enable the Import Form field.
- Enable Export from Excel: This is a checkbox which, if selected, allows users to enable the Export to Excel function for the control.
- Enable Select: This is a checkbox which, if selected, allows users to enable the selection of chart data from another form using a dropdown control.
- Apply: This button allows users to save their changes.
- OK: This button allows users to save their changes and close the window.