This status relates to where in the Transport deployment process the Task is.
Each control point within a path can be configured with a Task status. Whenever a Task, or any of the Transports attached to it are changed or move along a transport path, the Task Deployment status is updated. The Deployment Status assigned to each control point in a transport path is configured as he target is associated to a Path during path configuration.
A Deployment Status can be configured for each control point enabled (Inbox, Test Queue and Outbox).
When TE calculates the Deployment status of a Task, it takes into account all of the Transport Forms assigned to the Task and the Deployment Status Calculation configuration (this is detailed in the Other Configuration Options section of this document).
If transports are in several control points, TE will use the status with either the lowest or highest sequence number depending on this configuration option. If all transports assigned to the Task are finished in all paths, TE will set the system Deployment Status of COMPLETE.
Post your comment on this topic.