It is possible to create and assign multiple / conditional-based Import Schedules to Target systems.

This can be helpful in various scenarios, for example if you want Emergency Fixes to be imported at short notice, in advance of the normal import window of other fixes and changes.

Creation of condition-based Import Schedules

Condition-based Schedules can be configured within the Selection Criteria tab of the Transport Schedule screen within the Windows GUI.

Conditions can be based on both standard and custom fields at both a Task and Transport Form Level.

Configuration against Targets

The addition of additional schedules to SAP systems is done within the *Import Options” tab of an individual Target within the Windows GUI.

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment