Calendar based job working hours
Specifies whether the calculation of actual operation time take the Business Central production calendar into account.
The options are:
- Total registered time
- Total registered time w/o breaks
- Time from Prod. cal. w/o breaks
Total registered time
Specifies that all time used on the operation(s) will be registered in Business Central as capacity costs for the operation(s).
Total registered time w/o breaks
Specifies that all time used on the operation(s) will have breaks from the production calendar deducted before being registered in Business Central as capacity costs for the operation(s).
Time from Prod. Cal. w/o breaks
Specifies that only time used on the operation(s) within work hours in the production calendar will be registered in Business Central as capacity costs for the operation(s).