Early Project Guidebook - Living Building Challenge and Core
April 2025
  • April 2025
Table of Contents
Early Project Guidebook - Living Building Challenge and Core
  • April 2025
    • Early Project Guidebook - Living Building Challenge and Core — April 2025
GrabGrab
GrabGrab
  • Early Project Guidebook – LBC and Core
  • April 2025
  • Introduction
  • How to Use this Guidebook
  • Assessing Feasibility
    • Core Imperatives
    • Prohibited Sites
    • Combustion
  • Determine Basic Project Information
    • Overview
    • Typology
    • Applicable Imperatives
    • Project Area
    • Scale Jumping and Handprinting
    • Living Transect
  • Register a Project
    • Registration
    • Multiple Buildings
  • Resources
  • Summary of Changes
    • April 2025 Updates – Early Project
      • Changes to Determine Basic Project Information (Q1 25)
    • October 2024 Updates -- Early Project
      • Changes to Determine Basic Project Information (Q3 24)
    • July 2024 Updates – Early Project
      • Changes to Determine Basic Project Information (Q2 24)
    • May 2024 Updates – Early Project
      • Changes Throughout (Q1 24)
      • Determine Basic Project Information (Q1 24)
      • Changes to the Glossary (Q1 24)
    • Previous Versions of the Guidebook
  • ILFI Program Glossary
    • A-G Terms
    • H-P Terms
    • Q-Z Terms
Download as PDF

October 2024 Updates -- Early Project

This summary lists by section heading, the October 2024 updates to the Early Project Guidebook (EPG) originally published February 2021. Corrections made throughout for grammar, punctuation, nomenclature, typos, and links are not included. Previous iterations of the EPG are available to download here.

Changes to Determine Basic Project Information (Q1 25)
Changes to Determine Basic Project Information (Q3 24)
Copyright © 2025 International Living Future Institute — Powered by Manula.com