This summary lists by section heading, the May 2024 updates to the Early Project Guide originally published February 2021. These updates align with revisions for the LBC 4.1 update where they apply to the LBC 4.0 and Core Green Building Certification requirements. Corrections made throughout for grammar, punctuation, nomenclature, typos, and links are not included. Previous iterations of the EPG are available to download here.