After all tests for the team project are completed, it’s necessary to merge the results. There are two ways to check the aggregated results. The first is to check them on the dashboard. When running tests for the team project, Team Testing Server merges the results of all tests and displays them on the dashboard. The second is to generate reports for checking. Currently, CT 2023.12 does not provide report generation from Team Testing Server, so all tests must be gathered on one PC to generate a report.

Dashboard

You can view the results merged on Team Testing Server in a summary from the dashboard.

Report Generation

You can inport all tests onto a single PC and generate reports for those tests.

  1. Use [Import Team Test] feature to import tests from Team Testing Server.
  2. Since importing team tests doesn’t bring test results, all tests need to be run again.
  3. Use [Generate test report] feature to create a report for the project.

Need more help with this?
Don’t hesitate to contact us here.

Thanks for your feedback.