This status indicates where a Business Task is in the planning process.
Each planning step in a Change Path can have a status associated with it; every time a Business Task is changed, its planning status will be updated.
The Planning Status assigned to each change path step is configured in the Options tab of the step (in Planning configuration).
When Transport Expresso calculates the Planning status of a Task, it takes into account all of the active Change Path Steps for the Business Task and the Planning Status Calculation configuration (this is detailed on the Other Configuration Options section of this document).
If more than one step is active, ActiveControl will use the status with either the lowest or highest sequence number depending on this configuration option. If all steps in all Panning Change Paths for a Task are complete, ActiveControl will set the system Planning Status of “Complete”.
Post your comment on this topic.