Two (2) additional resources are available for download and printing, to aid users with ATevo start-up:
Prior to powering up ATevo for the first time, it is recommended that:
- You have followed installation instructions carefully.
- You check that ac input supply voltage and battery voltage match information on ATevo nameplate.
Open front panel door.
- Check battery polarity at the DC Output Breaker (CB2+/-).
Last modified:
24 November 2025


