As part of the smartShift integration, some other enhancements were added to ActiveControl, as follows:
Enhancement | BTI JIRA | Purpose |
ShiftLeft: Check Transport Presence | TE-2808 | To enable customers to prevent source ECC transport from being approved beyond a certain location when the same transport still existed (ie had not been merged or smartRetrofitted) in a parallel target. |
Enhanced Conflict Analysis | TE-2811 | To factor in name mapping where the S/4 object has been renamed versus its ECC counterpart. |
Enhanced Inline Risk | TE-2806 | To enable customers with multiple S/4 Development tracks to write their own custom logic to help drive the distribution of ECC transports to the relevant S/4 merge/retrofit track. |