When the automated testing cycle completes, Jenkins will report back to ActiveControl whether the testing was a Pass or Fail.
Based on that feedback, the Integration will then perform subsequent actions to add a Test Results entry onto the Business Tasks associated with the Transport Forms in the Import Queue, and if Pass, also move the Transport Forms out of the current Control Point location, to the next one.
Figure: Example of an automated Test Signoff triggered via Jenkins integration. Depending on the requirement, attachments or URL links can be passed back to ActiveControl and appended to the Business Task
Post your comment on this topic.