The following ActiveControl configuration should be done within SAPGUI directly.
# | Activity | _. Details |
---|---|---|
3.3.1 | Set up Email Notifications Job & Variant | Use SA38 on program /BTI/TE_RNOTIFICATION_ENGINE to switch on/off the required email notifications for your organisation in your Domain Controller. The following settings must also be configured: |
3.3.2 | Schedule Email notification job | Use SM36 to schedule program /BTI/TE_RNOTIFICATION_ENGINE to run every 2-5 minutes in the ActiveControl Domain Controller. Use the Batch user for the job steps. You may also need to schedule program RSCONN01 to run as a second step in this job if it is not already set up by your Basis team. This will actually send the emails. |
3.3.3 | Activate SAP GUI processing | Use SE16 to update table /BTI/TE_CONTROL in each of your development systems with an “Active” entry for the users that will be involved in testing. At Go-Live, entering a Blank username will switch on ActiveControl for all users. |
3.3.4 | Activate Development System SAP GUI Functions | Use SE16 to maintain table /BTI/TE_ACTIVE in your ActiveControl Domain Controller and switch on the relevant active functions required for your desired process:
|
3.3.5 | Web UI Activate web interface | Use SICF to activate the following services in your Domain Controller: default host > BTI > te web services default host > BTI > tessocntl default host > sap > public -> bsp -> sap (to enable web interface to work, all sub nodes must be activated ) default host -> sap -> bc -> gui -> sap -> its -> webgui (to enable the Reports to work in Web UI) default host > sap > bc -> bsp -> bti -> te_bsp_new When completed, establish the Web UI URL by testing the te bsp new service. |
3.3.6 | Schedule Web UI News Job | Use SM36 to schedule program /BTI/TE_RUNEWS_UPDATE to run every 5 minutes in the ActiveControl Domain Controller. (after first creating a variant in SE38) Use the Batch user for the job steps. |
3.3.7 | Schedule Web Following Job | Use SM36 to schedule program /BTI/TE_RUFOLLOWITEMS_UPDATE to run every 5 minutes in the ActiveControl Domain Controller. (after first creating a variant in SE38) Use the Batch user for the job steps. This can be run against the same job as the previous step. |
3.3.8 | Schedule TE Data Backup | Use SM36 to schedule a job to run program /BTI/TE_RBACKUP_DATA_EXP_NEW to back up all your ActiveControl data and configuration tables. (after first creating a variant in SE38. Make sure that the path for saving the files is valid. Run the program once to check it works.) Use the Batch user for the job steps. Basis Technologies would generally recommend that you schedule this backup on a daily basis. 1. Consider your backup frequency, 2. Consider your Domain Controller capacity consumption. |
3.3.9 | Archive Preparation | (Upgrades only) Use SE38 to run /BTI/TE_RUUPDATE_TASK_CRT_DATE to populate new Task Creation Date field on historically created Tasks. |
Post your comment on this topic.