Some TE functionality is relevant only for customers with dual/multi-track SAP. The configuration detailed in this section can be ignored if you are operating a single-track SAP landscape.

# Activity Details
3.5.1 Setup TE Merge Please refer to the TE Administration Guide for detailed instructions on setting up Merge Process.
3.5.2 Switch on Merge Conflict Analysis Within the Targets and Transport Paths tab, open all Merge Target Systems and in the Analysis Types tab, switch on ‘Conflict Analysis’ and make it mandatory.
3.5.3 Configure In-Line Conflict Analysis Systems Use SM31 to update table /BTI/TE_INLINE in the Domain Controller to configure which systems should be checked for parallel development activity.

For example, if systems ECD and EPD are parallel development systems, “Active” entries should be created here for ECD -> EPD and EPD -> ECD.
3.5.4 Configure In-Line Conflict Analysis Systems In the Windows GUI, ensure that you have entered a client number in the “Before Importing, check whether….” text box for the target.
This is required so that Transport Express what client to connect to for the analysis.

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment