In this field you tell the system, if the calculation of actual operation time shall be based on the NAV production calendar.
3 options are available:
- Total work hours
- Total works deducted breaks
- Production calendar work time deducted breaks
In this field you tell the system, if the calculation of actual operation time shall be based on the NAV production calendar.
3 options are available:
Post your comment on this topic.