All the relevant data that has bearing on the scheduling agreement, is saved in the tab CQ (cumulative quantity).

Cumulative received quantity (@IAG_RAT0.U_Efz):
Contains the cumulative quantity received (CQR) which is usually transmitted with the forecast delivery schedule through EDI. The CQR is the sum of all engrossed deliveries at the customer’s since the date of zero position until the boundary date (date of the last delivery).

Cumulative outgoing quantity (@IAG_RAT0.U_Vfz):
Contains the cumulative quantity delivered (CQD) which is usually increased with each ATM goods issue. The CQD is the sum of all deliveries since the date of zero position until the current point in time.

Residue (@IAG_RAT0.U_Rst):
Contains the residue which is usually transmitted with the forecast deliver schedule through EDI.

Instant demand (@IAG_RAT0.U_Sst):
Contains the instant demand which is usually transmitted with the forecast delivery schedule through EDI.

open goods issue (@IAG_RAT0.U_Ofnwas):
Contains the sum of all still open goods issues ( goods issue’s “shipment status” less than “07 – Delivery note created”).

Limiting date (@IAG_RAT0.U_Agrdat):
Contains the date of the last goods issue at the customer’s. This date is also called limiting date, because it separates the past from the present. The demands in the scheduling agreement are usually transmitted in the future only.

Comp. cum. rec. quantity (@IAG_RAT0.U_Vrgefz):
Contains the CQR of the last forecast delivery. This is the starting point for calculating the “Old delivery demands” (out of the tab “Demands”.

Date for Comp.cum.rec.qty. (@IAG_RAT0.U_Vrgdat):
Contains the boundary date of the last forecast delivery.

Compare timeframe in cal. days (@IAG_RAT0.U_Vrgzrm):
For future use.

Date of null position (@IAG_RAT0.U_Nstdat):
Contains the date of null position (zero position). It is usually transmitted by the forecast delivery through EDI.

Comparison residue (@IAG_RAT0.U_Vrgrst):
Contains the residue (backlog) of the last forecast delivery.

Comparison instant demand (@IAG_RAT0.U_Vrgsst):
Contains the instant demand (immediate requirement) of the last forecast delivery.

Limiting time (@IAG_RAT0.U_Agrzet):
Contains the time at which the calculation of the MRP happened. This field is filled only if the requirements come from the MRP, e.g. a provision partner sales order.

Last delivery date (@IAG_RAT0.U_Ltlidt):
Contains the delivery date of the last goods issue.

Last delivery time (@IAG_RAT0.U_Ltlizt):
Contains the time of the documents’ creation in the ATM goods issue.

Last delivery note (@IAG_RAT0.U_Ltlsnr):
Contains the last delivery note number.

Expected cumulated received quantity (@IAG_RAT0.U_Erwefz):
Contains the expected CQR with the last shipment.

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Please do not use this for support questions.
Kunden-Support

Post Comment