An Release Schedule defines a list of days and times when releases should be imported automatically.
When an Release Schedule is assigned to a Release, ActiveControl automatically creates a background job in the Domain Controller that will import associated business task/transport requests.
These background jobs should not be maintained or deleted from directly within SAPGUI.
ActiveControl ensures that the background job always executes according to the current version of the Release schedule. This includes deleting the aforementioned background job if the Release schedule is no longer assigned to the Release.
Configuration
Release Schedules are maintained by ActiveControl Administrators via the Release Schedules app tile. There are three steps to creating an Release Schedule:
1. Each Schedule has a description and optionally the user ID that the import should be scheduled under.
2. The timings are allocated to the Schedule, and then dragged to the right-hand window.
3. Any restrictions can be allocated to the Schedule.


Figure: Release Schedule configuration screen.


Post your comment on this topic.